Man, we worked hard ALL DAY Saturday/Sunday/Monday this weekend… did you have a holiday?? :) We had a ton of stuff to finish this weekend in order to drywall this week. The heating and air ducting ended up being WAY more work than we thought it was going to be. HUGE thanks to our buddy Justin who hooked it up! He helped us all afternoon Sunday and all day Monday- running the ducting. We desperately needed someone who knew what they were doing!! Justin was an awesome friend to us- and we would be nowhere near where we are now without him. We’ll finish up some things tonight and the plan is to drywall tomorrow! Woohoo!

Downstairs ducting:

Justin’s father-in-law lending a hand too:

Justin is THE MAN!

Upstairs ducting:

Finished all the insulating in the hall bath:


Master bath walls built out (I think that’s fiberglass floating around…):

All the floorboards finally nailed down!


Fully insulated here as well:

Check out that hot pink insulation- it’s wrapped in perforated plastic so you don’t get itchy! Amazing!


AC ducting is all done! We’ll be painting in a niceeee 72 degrees! Woohoo!

posted under: